
Jai Ambe Enterprises
Pimpri-Chinchwad, India jaiambeentp.com From their website, Nov 2026
- ISO 9001
Work here? Claim this listing
About
Jai Ambe Enterprises makes plastic injection molded components and molds for automotive and engineering customers. It is based in Pune, India and also provides engineering development and co-development with customers. The company also handles sub-assembly and mold design, development, and maintenance.
Jai Ambe Enterprises is a component maker in Pimpri-Chinchwad, India, founded in 2011. It lists 6 services, including Injection molding, Manufacturing services and Tool room and mold development. It names ISO 9001 on its listing. It works with engineering plastics and plastic.
Services
Injection molding
Manufactures plastic injection molded components to customer specifications.
Manufacturing services
Manages manufacturing programs and supplies quality products on time with project management and supervision.
Tool room and mold development
Designs and develops molds using CAD and 3D technology, with mold machining and assembly.
Engineering development
Provides engineering development and co-development with customers.
Sub-assembly
Offers sub-assembly services.
Tool room support
Designs and develops molds using CAD and 3D technology, with machining and assembly through partner facilities.
- Lead time
- Average time taken to manufacture a multi-cavity mould is 4 weeks
- 4 weeks
- What to send
- 2D / 3D drawings of the component
- Samples, if available
- Raw Material Specification Sheet
- Annual Quantity
How to order from Jai Ambe Enterprises
What to send, as they list it: 2D / 3D drawings of the component; Samples, if available; Raw Material Specification Sheet; Annual Quantity. Lead time they state: Average time taken to manufacture a multi-cavity mould is 4 weeks; 4 weeks. They take quote requests by email. You can contact them directly from this page, or request a quote through Midgard.
Capabilities
- Processes
- Injection molding
- Mold design
- Mold development
- Mold machining
- Mold assembly
- Engineering development
7 more
- Co-development
- Sub-assembly
- Mould design and development
- CAD and 3D mold design
- CNC machining
- Mould assembly
- Co-development with customer
- Capacity
- Average time taken to manufacture a multi-cavity mould is 4 weeks
- 2 Horizontal Injection Moulding Machine TOSHIBA 80 TON
- 3 Horizontal Injection Moulding Machine TOSHIBA 150 TON
- 1 Horizontal Injection Moulding Machine Asian Plastic 180 TON
- 1 Horizontal Injection Moulding Machine TOSHIBA 200 TON
- 80 ton
6 more
- 150 ton
- 180 ton
- 200 ton
- 450 ton
- 22 ton
- 5 TR
Equipment
- CAD
- 3D technology
- CNC machines
- Horizontal Injection Moulding Machine
- TOSHIBA 80 TON
- TOSHIBA 150 TON
6 more
- Asian Plastic 180 TON
- TOSHIBA 200 TON
- TOSHIBA
- Asian Plastic
- MOLDMASTER
- Chiller
Materials
- Engineering plastics
- Plastic
Industries served
- Automotive
- Engineering
- Engineering plastics
Company
- Type
- Component maker
- Founded
- 2011
Locations
- Office
- 1 Horizontal Injection Moulding Machine Dr Boy (Germany) 22 TON 1 Horizontal Injection Moulding Machine TOSHIBA
- Sites
- Pune, India
- Serves
- Local markets, international markets
Contacts
- General enquiry
- info@jaiambeentp.com on their site
- Phone
- +91 9011056991