Integrated Component Solutions LLC
Largo, FL, United States icsfla.com From their website, Nov 2026
Work here? Claim this listing
About
Integrated Component Solutions LLC designs, builds, programs, installs, and retrofits industrial control and automation systems. It serves manufacturers and machine builders in Tampa Bay from Largo, Florida. The company also fabricates UL 508A control panels and handles upgrades for obsolete equipment.
Services
PLC Retrofit & Replacement
Replaces end-of-life PLC processors with current supported platforms, adds a new UL 508A listed panel, documentation, and on-site commissioning.
Allen-Bradley PLC Upgrade & SLC 500 Replacement
Upgrades PLC-5, SLC 500, and ControlLogix systems, migrates DH+ and Remote I/O to Ethernet, and rebuilds I/O in a new UL 508A panel.
HMI Retrofit & PanelView Replacement
Replaces obsolete HMI terminals, including PanelView units, and rebuilds screens and PLC communications for current operation.
Industrial Control Panel Retrofit
Retrofits existing panels to UL 508A, recalculates SCCR, updates safety circuits, and delivers full documentation.
VFD Replacement
Replaces discontinued variable frequency drives, sizes and integrates new drives, updates wiring and documentation, and commissions them on load.
SCADA Upgrade
Migrates SCADA systems and historians to supported platforms and sets up backup and network architecture.
Industrial Automation Troubleshooting
Provides on-site diagnostics for PLC logic, HMI communication faults, VFD trips, and control wiring issues.
Control System Modernization & Factory Automation Retrofit
Creates phased modernization plans and full-line controls retrofits for plants, OEMs, and machine builders.
1 more services
- UL 508A Control Panel Fabrication
- Lead time
- 2-4 week build once scoped
- 4-8 week build once scoped
- What to send
- Photo of the nameplate
- Photo of the processor’s model/catalog number and the rack it sits in
- Photo of the screen or nameplate
- Photo of the drive nameplate
- Photo of the panel interior
- Panel spec or drawing
- CAD
- Minimums and prices
- Fixed-price proposal
Capabilities
- Processes
- PLC retrofit
- PLC replacement
- HMI retrofit
- PanelView replacement
- Industrial control panel retrofit
- VFD replacement
9 more
- SCADA upgrade
- Industrial automation troubleshooting
- Control system modernization
- Factory automation retrofit
- UL 508A panel fabrication
- Control panel design
- Control panel installation
- Control panel programming
- On-site commissioning
- Capacity
- Single-machine retrofit is often a 2-4 week build once scoped
- Most single-panel retrofits are a 4-8 week build once scoped
Equipment
- SolidWorks
- SolidWorks Electrical
Materials
- Aluminum
- Titanium
- Brass
- Bronze
- Tool Steel
- Mild Steel
- Stainless Steel
Industries served
- Power generation
- Forest products
- Medical and Pharmaceutical
- Packaging
- Plastic injection molding
- Food production
4 more
- Agricultural products
- Mobile equipment
- Building control systems
- Discrete manufacturing
Details
- Quality
- UL 508A (panels and listed builds) · NEC Article 409 (SCCR marked per NEC Article 409) · NFPA 79 (safety circuits and panel work) · IEC 60204 (safety circuits and panel work) · NEMA ICS 1-2022 (panel work) · OSHA 29 CFR 1910 Subpart S (panel work)
- Based in
- Largo, FL, United States
- Sites
- Tampa, USA
- St. Petersburg, USA
- Clearwater, USA
- Serves
- Tampa Bay, Pinellas County, surrounding Bay area
- Phone
- 727-221-9368