
Heat Treatment 2000
West Bromwich, United Kingdom ht2000.co.uk From their website, Nov 2026
Work here? Claim this listing
From public sources; details may contain errors.
Equipment
- Can Eng furnace
- 1 tonne line
- Rapid quench aluminium furnace
- Large furnace
- Small furnace cell
Materials
- Ferrous metals
- Non-ferrous metals
- Alloy steels
- Carbon steels
- Cast aluminium
- Wrought aluminium
- Extruded alloys
As stated by Heat Treatment 2000.
About
Heat Treatment 2000 Ltd provides heat treatment services for ferrous and non-ferrous metals. It is located in West Bromwich, West Midlands, England, and serves customers needing controlled metal treatment and testing.
Services
Continuous Hardening and Tempering
Heat treatment of ferrous parts in a controlled protective atmosphere, with oil quenching.
Tempering
Reheating parts to obtain the strength required to meet customer specification.
Carbon Restoration
Restores carbon in the material during the hardening process by controlling furnace atmosphere carbon content.
Case Hardening
Creates a hard wearing surface layer harder than the core of the parts.
Carbonitriding
Case hardening with the addition of ammonia gas to increase surface hardness.
Stress Relieving
Heats parts to a predetermined temperature below 720°C and allows them to cool in air.
Solution & Precipitation Hardening
Heat treatment for cast and wrought aluminium and extruded alloys to change mechanical properties.
Annealing
Provided as a thermal treatment for non-ferrous metals.
3 more services
- Hot Water, Cold Water & Polymer Quenching
- Setting
- Thermal Decore
Prices, terms and documents
Loading…
How to order from Heat Treatment 2000
Minimums and prices they state: £1.6 Million investment in a Can Eng 2.7 Tons per hour furnace; £1 Million line installed; £2.5 million investment in Aluminium Processing Plant. They take requests through the contact form on their website. You can contact them directly from this page, or request a quote through Midgard.
Capabilities
- Processes
- Harden and temper
- Carbon restoration
- Continuous carburizing
- Continuous carbonitriding
- Tempering
- Stress relieving
9 more
- Computer controlled tracking
- Solution treatment
- Precipitation treatment
- Annealing
- Hot water quenching
- Cold water quenching
- Polymer quenching
- Thermal decore
- Rapid quench
- Capacity
- 400 tons per week
- 2.7 tons per hour
- 1 Ton continuous line
- 100 tons per week
- Up to 2 ton loading
- Vehicles from 26 tons to 44 tons
Industries served
- Automotive
Details
- Founded
- 1992
- Quality
- CQI-9 (external accreditation since 2008) · IATF 16949:2016 (heat treatment processes) · ISO 9001:2015 (quality management) · PPAP (Production Part Approval Process) · APQP (Advanced Product Quality Planning) · FMEA (Failure Mode and Effects Analysis)
- Based in
- West Bromwich, United Kingdom