Donsco Incorporated

Donsco Incorporated

Wrightsville, PA, United States donsco.com From their website, Nov 2026

Work here? Claim this listing

From public sources; details may contain errors.

Lead time
1 day to 6 weeks

Equipment

  • Cupola
  • CNCs
  • 3D printer
  • CNC horizontal lathes
  • CNC vertical lathes
  • CNC vertical milling machines
  • Horizontal machining centers
  • Disamatic lines
  • Sinto molding lines

Materials

  • Gray iron
  • Ductile iron
  • Austempered ductile iron
  • Alloyed iron
  • High silicon molybdenum
  • Phenolic urethane
  • Resin coated sand
  • Furan
  • Cold box
  • Warm box
  • Heat shell

As stated by Donsco Incorporated.

About

Donsco Incorporated makes gray, ductile, austempered ductile, alloyed, and high-silicon molybdenum iron castings and machined parts for industrial customers. It operates foundry, machining, tooling, and engineering operations in Wrightsville and Mount Joy, Pennsylvania.

Services

  • Iron casting production

    Produces short-run and longer-running iron castings in gray, ductile, and alloyed grades up to 150 pounds.

  • Machining

    Machines castings and finished parts in-house through CNC machining operations.

  • Engineering services

    Turns design concepts into fully machined castings and supports product development, prototypes, and weldment conversions.

  • Patternmaking

    Provides in-house patternmaking operations.

  • Subassembly kitting

    Offers subassembly kitting as part of machining capabilities.

Prices, terms and documents

Loading…

How to order from Donsco Incorporated

What to send, as they list it: Part design concept; Existing tooling to re-locate. Lead time they state: 1 day to 6 weeks. They take quote requests through a form on their website. You can contact them directly from this page, or request a quote through Midgard.

Capabilities

Processes
  • Casting
  • Machining
  • Tooling
  • Patternmaking
  • Product development
  • Weldment conversion
5 more
  • Prototype making
  • 3D scanning
  • Reverse engineering
  • 3D printing
  • Subassembly kitting
Capacity
  • 165,000 ft^2 foundry manufacturing space
  • 25,000 ft^2 CNC machining manufacturing space
  • 13,000 ft^2 tooling manufacturing space
  • 14,500 ft^2 administrative space
  • 350 people
  • Up to 150 pounds
3 more
  • 4-6 weeks lead-times
  • 2-3 week prototype turnaround capability
  • 24 hours / 7 days a week

Industries served

  • Industrial
  • Hardware

Details

Founded
1906
Team
350
Quality
ISO 9001:2015 (all plants) · IATF 16949 (all plants)
Based in
Wrightsville, PA, United States
Sites
Mount Joy, United States

Similar suppliers