Midgard Industrial
DI

Dolan Integration Group LLC

Broomfield, CO, United States digforenergy.com From their website, Nov 2026

Work here? Claim this listing

About

Dolan Integration Group LLC runs a geochemical and compliance water testing lab for oil and gas work. It also provides stable isotope analysis, gas chromatography, XRF elemental analysis, carbon capture monitoring, natural gas storage monitoring, and QuickStart Maturity studies. The lab and office are in Westminster, Colorado, and the company serves Colorado, Wyoming, and New Mexico compliance programs as well as broader energy-sector projects.

Services

  • Compliance Water Testing Lab

    Tests nonpotable water for oil and gas compliance, including groundwater, wastewater, discharge, surface casing, and bradenhead pressure investigations.

  • Natural Gas Stable Isotope Analysis

    Analyzes hydrocarbon gas composition with stable isotope analysis to characterize gas genetics and applications such as gas origin, migration, storage fingerprinting, carbon capture baseline and monitoring, and stray gas forensics.

  • Water Stable Isotope Analysis

    Uses stable isotopes of water to distinguish water sources and assess frac water, formation water, flowback, cleanup, fault/fracture intersections, and anomalous water cuts.

  • Whole Oil Gas Chromatography Analysis

    Lists whole oil gas chromatography analysis as a lab service.

  • XRF Elemental Analysis

    Provides hand-held X-ray fluorescence elemental analysis for understanding elemental and mineral composition of rocks in oil and gas plays.

  • Carbon Capture Monitoring Services

    Monitors carbon capture, utilization, and storage systems with chemical baseline setting, injection monitoring, post-injection monitoring, and stable isotope analysis.

  • Natural Gas Storage Monitoring

    Provides monitoring, verification, and assessment support for underground natural gas storage facilities and related infrastructure.

  • QuickStart Maturity Studies

    Builds petroleum systems and basin maturity models to evaluate heat distribution, maturity, hydrocarbon phase, and basin-scale exploration and development risk.

1 more services
  • Bradenhead Pressure Monitoring
Lead time
3 days to 3 months
What to send
  • Tell us your state, the rule, and the number of locations
  • Request kits
  • Download chain of custody
  • Pre-preserved bottles
  • Instructions
  • Chain-of-custody form
  • Sampling and analysis follow the applicable state rule

Capabilities

Processes
  • Water chemistry testing
  • Dissolved-gas analysis
  • Stable isotope analysis
  • Gas compositional analysis
  • Gas chromatography
  • X-ray fluorescence (XRF) elemental analysis
7 more
  • Hand-held XRF analysis
  • Carbon capture monitoring
  • Groundwater compliance testing
  • Produced water testing
  • Basin modeling
  • Petroleum systems modeling
  • Maturity modeling
Capacity
  • Standard turnaround is 10 business days
  • Rush: 5 business days
  • Super Rush: 3 business days
  • QuickStart Maturity studies include basin models and project files in Trinity Zetaware and ArcGIS formats

Equipment

  • Niton XL3t GOLDD+ XRF Analyzer

Materials

  • Nonpotable water
  • Groundwater
  • Wastewater
  • Produced water
  • Hydrocarbon gas molecules
  • CO2
3 more
  • Methane
  • Ethane
  • Propane

Industries served

  • Oil and gas
  • Energy
  • Midstream
  • Exploration
  • Development
  • Production
  • Environmental

Company

Type
Test lab
Ownership
Small business · Woman-owned, as registered with SAM.gov or stated on their site
Quality
A2LA 7797.01 (nonpotable water: groundwater, wastewater, and produced water) · NELAP/TNI (nonpotable water) · ISO/IEC 17025:2017 (nonpotable water) · TNI (NGAB) (nonpotable water)

Locations

Based in
Broomfield, CO, United States
Sites
Westminster, United States
Serves
Colorado, Wyoming, New Mexico, onshore U.S. lower 48, Canada, Mexico, Australia, South America, Asia

Contacts

Similar labs